- Our technical and tooling teams will review the tooling and, where possible, maximise the cavities to produce as many parts as possible on one injection cycle. There is a huge cost saving to be had by investing in multi-cavity tooling upfront rather than manufacturing parts over a longer production run. If you wish to review current tooling or discuss multi-cavity tool options, drop us a mail to [email protected]
- Mass production naturally lends itself to automation as the production runs are over a long period of time, and the ROI (Return on Investment) in automation is quick. Nordell can advise on automation options to reduce labour requirements and cost, whether this be a simple addition such as a conveyer to robotics to remove and pack parts.
Our Robust Development Process:

Concept & Requirements
Discovery

Design for Manufacture
Investigation and Development
- Offer & Project Commercialisation.
- Standardise materials, colours, number of parts, Inserts and build Operations.
- Product and Design exploration with Sector cross pollination.
- Initial FMEA & Control Plan.
- Project Management.
- Report & Proposals to Client.
- Prototype and review.

Product Tooling Design & Manufacture
Tooling and Sampling
- Design Freeze with 2D drawings & 3D files.
- Tool Design GA customer approval.
- Tool Manufacture.
- Product & Tool identification standard for asset and labelling.
- Product ERP structure, Centre selection, Bill of Materials and route standardisation.
- Product materials procurement.
- Production trials scheduling.

Product & Tooling Trials
Sampling
- Customer update.
- Tooling and production trials.
- T1 Sample submission.
- Review, Tune & Development.
- Tooling and Production Trials.
- T2 Sample submission.
- Sampling Review.

Product Part Approval
Verification and Validation
- PPAP Product Part Approval Process.
- First Article Inspection reports.
- FMEA review.
- Tooling Review.
- Pilot production requirements.
- Tooling Acceptance.

Product Approved
Industrialisation
- Transfer to commercial teams.
- Product can be scheduled against production requirements.
- Delivery terms reviewed (VMI, KANBAN).
- Review.